BRIEF REPORT ON WORKS EXECUTED UNDER FLOOD MANAGEMENT PROGRAMME (FMP) PERTAINING TO DIBRUGARH WATER RESOURCES DIVISION, DIBRUGARH

1. STRENGTHENING OF DIBRUGARH TOWN PROTECTION WORKS FROM MAIJAN TO MOHANAGHAT INCLUDING BOULDER REVETMENT WORK AT CH 5300M TO 5500M AND CH. 8100M TO CH. 8300M:-

The scheme “Strengthening of Dibrugarh Town Protection works from Maijan to Mohanaghat including boulder revetment work at Ch 5300m to 5500m and Ch. 8100m to Ch. 8300m” under Flood Management Programme amounting to Rs. 13,79,90,000.00 has been successfully completed on February 2012 protecting vast area of 32,614 Hec and a population of 5,20,000 Nos. The major provision of the schemes were Strengthening of the Spurs (I,III, IV,V,VI &VII)and Anti-erosion works with bank revetment apron for a length of 235m. Photographs after completion of the works are furnished below:-

2. RAISING & STRENGTHENING OF DEHING BUND R/B FROM KOTOHA TO SESSAMUKH:-

The scheme “Raising & Strengthening of Dehing bund R/B from Kotoha to Sessamukh” under Flood Management Programme amounting to Rs. 1,260.36 Lakhs has been successfully completed on March 2015 protecting vast area of 10,000 Hec and a population of 35,000 Nos. The major provision of the schemes were Raising work for a length of 12th Km, and porcupine works at 17th Km & 23rd Km. Photographs of the completion of the work are furnished below:-

3. RAISING AND STRENGTHENING OF FLOOD PROTECTION BUND OF TENGAKHAT MOUZA INCLUDING A/E MEASURES AT 3RD KM (BANTONA) AND 12TH KM (TIKIRABALI):-

The scheme “Raising and strengthening of flood protection bund of Tengakhat Mouza including A/E measures at 3rd km (Bantona) and 12th km (Tikirabali)” under Flood Management Programme amounting to Rs. 1461.86 Lakh has been successfully completed on March 2015 protecting vast area of 6,000 Hec and a population of 60,000 Nos. The major provision of the schemes were earth work by T/C,  earth work by H/L , launching of RCC porcupine. Photographs after completion of the work are furnished below:-

4. RAISING AND STRENGTHENING ON THE R/B OF DISAM RIVER INCLUDING REPAIRING OF SLUICE CULVERTS FROM GHUGULANI TO DISAM OUTFAL

The scheme “Raising and strengthening on the R/B of Disam River including repairing of sluice culverts from Ghugulani to Disam outfal” under Flood Management Programme amounting to Rs. 920.75 Lakhs has been successfully completed on March 2015 protecting vast area of 6,000 Hec and a population of 50,000 Nos. The major provision of the schemes were Earth Work.(R/S Works) Earth work by Truck Carriage/Head Load at embankment section. Repairing of civil/mechanical structure of the Seven nos. sluice culvert/gates, Temporary palliative measures (Launching of R.C.C porcupine). Photographs after completion of the work are furnished below:-

5. A/E MEASURES TO PROTECT THE LEFT BANK EMBANKMENT OF RIVER BURIDEHING AT NAMFAKIAL VILLAGE

The scheme “A/E measures to protect the left bank embankment of river Buridehing at Namfakial Village” under Flood Management Programme amounting to Rs. 1345.27 Lakhs has been successfully completed on March 2015 protecting vast area of 7,500 Hec and a population of 31,422 Nos. The major provision of the schemes were Geo Tubular mattress in revetment, geo-bags in apron, geo-bags in wire netting box, earth work in embankment, R.C.C. Porcupine bar. Photographs after completion of the works are furnished below: